Target Repaints
Each year Target entrusts RJB with re coating and sealing their buildings all across the US. These projects are particularly interesting because each has a unique color scheme resulting in a dramatic transformation. This beautiful transformation is evident in this feature project in Miami Gardens, FL. The project scope includes all exterior and interior paint, replacement of vertical control joints and horizontal base joint sealant, and sealing the unpainted decorative stone or brick when present. The projects last anywhere between 4-8 weeks depending on size and complexity.
Target
locationNational
year completed2019
IndustryRetail
Square Footage50,000
Duration4 weeks
Project ManagerTim Beehler